EnergyPro partnered with Schneider Electric and Brisbane Airport Corporation (BAC) to deliver the design and construction of a warehouse at BAC, integrating BAC-specific requirements and infrastructure connections. The project required coordination with BAC contractors, including the integration of a new transformer (TX), and adapting to client-driven design changes mid-construction to ensure future-proofing and cost efficiency. EnergyPro’s ability to rapidly adjust designs and installation methods led to a successful outcome, securing ongoing work with Schneider Electric.