420 George – Electrical Infrastructure Upgrade

Commercial

Description
EnergyPro led the replacement of core electrical infrastructure in a live, multi-tenant building, delivering a new main switchboard with generator backup and automated controls. To minimize disruptions, a temporary generator-maintained power during the changeover, ensuring continuous operation for tenants. A 3-tonne switchboard and rooftop generator were installed using specialist ‘lift and shift’ techniques and a crane lift, with EnergyPro managing all Brisbane City Council permits and traffic control. As head contractor, Energypro executed the project with precision, mitigating risks and ensuring a seamless transition with minimal power interruptions.
Project value
1.4M
Client
Dymocks Properties
Partner
Floth
Testimonial
EnergyPro delivered the 420 George electrical upgrade with a high level of professionalism and attention to detail. The team was reliable, responsive, and worked seamlessly within a live environment. A great result all round.
Cathy Tiberio, Finance Director and CEO – Property, Dymocks Group
Project Snapshot
Core electrical infrastructure upgrade in a live, multi-tenant building, ensuring minimal disruption through strategic power management, specialist equipment installation, and efficient stakeholder coordination.
3000
Hours of labour
0
Loss of power or downtime for tenants.