EnergyPro led the replacement of core electrical infrastructure in a live, multi-tenant building, delivering a new main switchboard with generator backup and automated controls. To minimize disruptions, a temporary generator-maintained power during the changeover, ensuring continuous operation for tenants. A 3-tonne switchboard and rooftop generator were installed using specialist ‘lift and shift’ techniques and a crane lift, with EnergyPro managing all Brisbane City Council permits and traffic control. As head contractor, Energypro executed the project with precision, mitigating risks and ensuring a seamless transition with minimal power interruptions.